Friday, 23 September 2016

Nagar and Periyapatna in Mysore district and Arakalgudu in Hassan district

The taluks to be benefited from the Harangi project are Hunsur, K.R. The work on the Harangi dam and 153 km of the left bank canal and 138.5 km of the right bank canal have been completed. According to a report, out of the 790 TMC total yield of water in the Cauvery basin, the yield from Kodagu alone is 400 TMC.
_

Judith:
The other day someone called me asexual because I don't do anything with girls.
(23 September 2016)

Judith:
Everyone else I talk to has had hookups and stuff at parties and I get girls at the parties I'm not just good at what to do next.
(23 September 2016)

Judith:
I'm like girls a lot and stuff and it bother me how this always happens . I'm wondering what I can do to make things go better and not be dumb and do nothing with them so they lose interest.
(23 September 2016)

Judith:
Like they all except me to do something like kiss them or make out with them but like when and how should I do it.
(23 September 2016)

Judith:
I am very good at getting girls to like me but I am not sure what to do on dates and stuff.
(23 September 2016)

Judith:
Since then over the last year I have had opportunities with plenty of girls but Im just not good with what to do.
(23 September 2016)

Judith:
After three dates she ended up breaking up with me to hook up with some senior at a party.
(23 September 2016)

Judith:
But I really struggled with when the right time do do something is and what to do exactly.
(23 September 2016)

Judith:
This was mostly my fault because I did fine socializing and talking and during the date.
(23 September 2016)

Judith:
We went on three dates didn't kiss or do anything besides hugging.
(23 September 2016)

No comments:

Post a Comment